CHARLEVILLE PUMPING STATION (IRL)

Année: 2019
Emplacement: Charleville (IRL)
Bureau d’étude: Munster Water
Client final: Munster Water
Application: EAU POTABLE

The Charleville pumping station has been chosen to test a new optimization system for the water distribution tanks.
The pilot project started about six months ago allowed to test the potential of the PMD system on an existing plant.
The level control function has reduced the pump operating time about 22 hours a day, as well as allowed to collect a lot of useful data to plan the next implementations across the region.
Real-time communication and the “machine learning” approach of the PMD, allow the water authority to keep the entire network under control and to activate the necessary safety procedures in case of emergency.