Installation hydroélectrique en Sicile (Italie)

Année: 2016
Emplacement: AGRIGENTO (AG), ITALIE
Bureau d’étude: LUMIEI IMPIANTI
Client final: SICILIA ACQUE S.P.A.
Application: HYDROELECTRIQUE

The plant is built on an existing structure of the Fanaco potabilizer managed by Sicilia Acque. The purpose of the project is to recover the energy of water that was otherwise dissipated in tanks before directing it to the water purifier..

The plant, is inserted on the supply pipe of an existing water purifier, therefore it has been necessary to realize an interception by-pass to allow the water to be diverted to the new hydroelectric plant. The water, after being swirled, is then reintroduced into the pipeline that leads it to the treatment tank for potabilization and then distribute it to the users. The valves installed, in addition to the classic functions at the service of the turbine, have the task of regulating the flow of water to the water purifier as well as ensuring, in total safety, the possible blocking of the turbine bypassing it completely.

The plant realized in this way allowed to generate energy with a power of about 180KW.

PRODUITS:

Vannes Annulaires
1 x ACMO REGFLUX F801 DN 200 PN 16 avec moteur électrique modulant
1 x ACMO REGFLUX F801 DN 400 PN 16 avec moteur électrique modulant
1 x ACMO REGFLUX F801 DN 500 PN 16 avec moteur électrique modulant
2 x ACMO REGFLUX F801 DN 700 PN 16 avec moteur électrique modulant

Vannes Papillon
1 x ACMO DOPEX FIG 201A DN 400 PN 16 avec moteur électrique modulant
1 x ACMO DOPEX FIG 201A DN 450 PN 16 avec moteur électrique modulant
1 x ACMO DOPEX FIG 201A DN 700 PN 16 avec moteur électrique modulant
2 x ACMO DOPEX FIG 901A DN 500 PN 16 avec actionneur hydraulique et contrepoids
1 x ACMO DOPEX FIG 901A DN 700 PN 16 avec actionneur hydraulique et contrepoids

Joints de Demontage
3 x ACMO JOINT FIG 4016 DN 400 PN16
1 x ACMO JOINT FIG 4016 DN 450 PN16
2 x ACMO JOINT FIG 4016 DN 500 PN16
3 x ACMO JOINT FIG 4016 DN 700 PN16

Robinets Vannes
1 x DN500 PN 16